Page 2: Urban Challenges and Transportation Solutions
The second page focuses on social challenges in lagos, particularly addressing transportation issues and water access problems. The city has implemented various solutions to combat these challenges.
Vocabulary: BRT (Bus Rapid Transport) - A dedicated bus system with designated lanes and multiple stops throughout the city.
The BRT system's achievements include:
- Daily usage exceeding 220,000 passengers
- 30% reduction in travel time
- 13% reduction in air pollution
- Creation of 2,000 new jobs
Highlight: Traffic congestion impacts extend beyond inconvenience, affecting:
- Social aspects (health issues, accidents)
- Economic factors (increased costs, lost productivity)
- Environmental concerns (increased fuel consumption, air pollution)
Example: Water access challenges are exemplified by the reliance on boreholes (55% of water supply) and unreliable electricity for pumping systems.